This is a summary of the design steps explained by Dr Yehia in the 4th lecture.
I hope that helps.
Click the following link, if you couldn't see the image properly here
https://2img.net/r/ihimizer/img89/8360/sewerdesignstepsfw6.png
I hope that helps.
Click the following link, if you couldn't see the image properly here
https://2img.net/r/ihimizer/img89/8360/sewerdesignstepsfw6.png
amelsakka- Number of posts : 77
Reputation : 3
Registration date : 2008-11-14
Re: Steps of Sewer Section Design
Thxxxxxxxxxxxxxxxxxxxxxx awy ya Ahmed
Mana- Gender : Number of posts : 554
Reputation : 3
Birthday : 1986-02-16
Registration date : 2008-02-29
Re: Steps of Sewer Section Design
بجد والله انت رائع
maged- Gender : Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02
Re: Steps of Sewer Section Design
I'm available if anyone has ANY question.
Also my number is 0122224676, call ANYTIME till Saturday.
Also my number is 0122224676, call ANYTIME till Saturday.
amelsakka- Number of posts : 77
Reputation : 3
Registration date : 2008-11-14
Re: Steps of Sewer Section Design
By the way,, in the third question in our midterm exam,, when you get Qtotal, consider it Qdesign,, then follow the above steps.
The only difference, is that instead of assuming (D), you will assume (Vdesign) and then get (D) from A= Q/V
From this D, get the corrected D from the available diameters and go to step 5 above and continue steps.
The only difference, is that instead of assuming (D), you will assume (Vdesign) and then get (D) from A= Q/V
From this D, get the corrected D from the available diameters and go to step 5 above and continue steps.
amelsakka- Number of posts : 77
Reputation : 3
Registration date : 2008-11-14
Re: Steps of Sewer Section Design
ooooh Merci beaucoupamelsakka wrote:I'm available if anyone has ANY question.
Also my number is 0122224676, call ANYTIME till Saturday.
معلش بقى اصل ثقافتي فرنسيه
maged- Gender : Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02
Re: Steps of Sewer Section Design
بقولك ايه يا بو حميد الاقيش معاك امتحان الميدترم ضروري
maged- Gender : Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02
Re: Steps of Sewer Section Design
thx ahmed for the great effort w yareet fe3lan ykoon ma3ak l midterm 3alashan ana fe3lan nasy shakl l mas2ala l talta dy kan 3amel ezzau
bassem zakarya- Number of posts : 200
Reputation : 0
Registration date : 2008-02-28
Re: Steps of Sewer Section Design
Ahmed 7atnzel el exam wlaa anzelo ana.....
Mana- Gender : Number of posts : 554
Reputation : 3
Birthday : 1986-02-16
Registration date : 2008-02-29
Re: Steps of Sewer Section Design
excuse me Ahmed i have a comment about the design steps
we will assuming "a reasonable" diameter and get Qf and we have to try more than one Diameter to reach the targeted ratio Q/Qf and that ration should satisfy that condition (y/d=2/3 for d<700mm & y/d=1/2 for d>700mm)
so....
y don't we "Begin with end in mind ".....
assume y/d (2/3 or 1/2) and using curves u can get Q/Qf and......
by knowing Q (the max of Qdwf & Qwwf) we can get Qf so we have only one unknown which will be the diameter ======= get it exactly without more trials (no need to say that it should be rounded to the nearest commercial one )
I hope it's useful
we will assuming "a reasonable" diameter and get Qf and we have to try more than one Diameter to reach the targeted ratio Q/Qf and that ration should satisfy that condition (y/d=2/3 for d<700mm & y/d=1/2 for d>700mm)
so....
y don't we "Begin with end in mind ".....
assume y/d (2/3 or 1/2) and using curves u can get Q/Qf and......
by knowing Q (the max of Qdwf & Qwwf) we can get Qf so we have only one unknown which will be the diameter ======= get it exactly without more trials (no need to say that it should be rounded to the nearest commercial one )
I hope it's useful
bassem zakarya- Number of posts : 200
Reputation : 0
Registration date : 2008-02-28
Re: Steps of Sewer Section Design
اي حد ينزلو المهم ينزل والسلام وياريت بقى يا مانا لو معاكي الحل بتاعوMana wrote:Ahmed 7atnzel el exam wlaa anzelo ana.....
maged- Gender : Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02
Re: Steps of Sewer Section Design
msh m3aya el7al w elexam isa 7aykon 10 min w 7aykon here
Mana- Gender : Number of posts : 554
Reputation : 3
Birthday : 1986-02-16
Registration date : 2008-02-29
Re: Steps of Sewer Section Design
ايمان والنبى مش وقت زل يلا عشان باسم يلحق يحل اخر مساله والنبى وليكى عليه هجبلك حاجات حلوة كتير
hossam- Number of posts : 281
Reputation : 0
Registration date : 2008-03-17
Re: Steps of Sewer Section Design
اشكرك بشدهMana wrote:msh m3aya el7al w elexam isa 7aykon 10 min w 7aykon here
الحمد لله اخيرا لقيته مع حد
maged- Gender : Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02
Re: Steps of Sewer Section Design
walahy barf3o now :D Hosssam pasha lya 3andk kda wa7da wal 2olk 2 b2a Snikers :D:D ent ely 2olt 7atgebly 7aga 7elwa :P...wlaahy ya gam3a barfa3o now
Mana- Gender : Number of posts : 554
Reputation : 3
Birthday : 1986-02-16
Registration date : 2008-02-29
Re: Steps of Sewer Section Design
علبة سنكرس للباشا يا ولدبسرعة
hossam- Number of posts : 281
Reputation : 0
Registration date : 2008-03-17
Re: Steps of Sewer Section Design
excuse me Ahmed i have a comment about the design steps
we will assuming "a reasonable" diameter and get Qf and we have to try more than one Diameter to reach the targeted ratio Q/Qf and that ration should satisfy that condition (y/d=2/3 for d<700mm & y/d=1/2 for d>700mm)
so....
y don't we "Begin with end in mind Very Happy".....
assume y/d (2/3 or 1/2) and using curves u can get Q/Qf and......
by knowing Q (the max of Qdwf & Qwwf) we can get Qf so we have only one unknown which will be the diameter ======= get it exactly without more trials (no need to say that it should be rounded to the nearest commercial one Very Happy)
I hope it's useful
we will assuming "a reasonable" diameter and get Qf and we have to try more than one Diameter to reach the targeted ratio Q/Qf and that ration should satisfy that condition (y/d=2/3 for d<700mm & y/d=1/2 for d>700mm)
so....
y don't we "Begin with end in mind Very Happy".....
assume y/d (2/3 or 1/2) and using curves u can get Q/Qf and......
by knowing Q (the max of Qdwf & Qwwf) we can get Qf so we have only one unknown which will be the diameter ======= get it exactly without more trials (no need to say that it should be rounded to the nearest commercial one Very Happy)
I hope it's useful
bassem zakarya- Number of posts : 200
Reputation : 0
Registration date : 2008-02-28
Re: Steps of Sewer Section Design
ma3lesh edtarret a3edha tany 3alashan l nas te2raha w ya reet law 7aga msh wad7a t2olo-ly awadda7ha
bassem zakarya- Number of posts : 200
Reputation : 0
Registration date : 2008-02-28
Re: Steps of Sewer Section Design
You are right, Bassem.
As I said, that was a summary of what dr Yehia explained, not my solution
Anyway, don't forget to round the calculated D and also check the rounded diameter.
As I said, that was a summary of what dr Yehia explained, not my solution
Anyway, don't forget to round the calculated D and also check the rounded diameter.
amelsakka- Number of posts : 77
Reputation : 3
Registration date : 2008-11-14
Re: Steps of Sewer Section Design
والله ياباسم فكره حلوه اوي اوي .....بس فيه حاجهbassem zakarya wrote:excuse me Ahmed i have a comment about the design steps
we will assuming "a reasonable" diameter and get Qf and we have to try more than one Diameter to reach the targeted ratio Q/Qf and that ration should satisfy that condition (y/d=2/3 for d<700mm & y/d=1/2 for d>700mm)
so....
y don't we "Begin with end in mind Very Happy".....
assume y/d (2/3 or 1/2) and using curves u can get Q/Qf and......
by knowing Q (the max of Qdwf & Qwwf) we can get Qf so we have only one unknown which will be the diameter ======= get it exactly without more trials (no need to say that it should be rounded to the nearest commercial one Very Happy)
I hope it's useful
هل الدكتور هيوافق نعمل كده في الامتحان
انت عارفه كويس.. ثم انه قال ان فيه طرق كتير للحل ولكن احنا هنحل
up to yahia
يعني اعتقد اننا لازم نلتزم بالخطوات اللي هو اداها بس ممكن نبقى نعمل زي منتا بتقول كده في الاول.. على جنب كده
وبعدين نبقى نستخدم الديامتر اللي احنا جبناه من طريقتك وكاننا فرضناه كده
ونكمل الحل عادي
maged- Gender : Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02
Re: Steps of Sewer Section Design
take care:
D(min)=100 for water.
D(min)=200 for sewer section.
D(min)=100 for water.
D(min)=200 for sewer section.
maged- Gender : Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02
Re: Steps of Sewer Section Design
la ya maged l Dr. altaf mn kda b kteer
w ba3deen elly ana ba2oloh dah msh tare2et 7all gdeeda
dy taree2et 7all l doctor bas b tare2a absat ya3ny ana ma3'ayyartesh fil asaseyyat
w ba3deen elly ana ba2oloh dah msh tare2et 7all gdeeda
dy taree2et 7all l doctor bas b tare2a absat ya3ny ana ma3'ayyartesh fil asaseyyat
bassem zakarya- Number of posts : 200
Reputation : 0
Registration date : 2008-02-28
Re: Steps of Sewer Section Design
والله لو انت متاكد يبقى الكلام ده كده بيييس اوي
maged- Gender : Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02
Re: Steps of Sewer Section Design
mate2la2sh
bassem zakarya- Number of posts : 200
Reputation : 0
Registration date : 2008-02-28
Re: Steps of Sewer Section Design
I agree with you, Bassem.
When I was asking the dr about something in the sheet problems, he said, do whatever you want, as long as you will reach the same result.
When I was asking the dr about something in the sheet problems, he said, do whatever you want, as long as you will reach the same result.
amelsakka- Number of posts : 77